Updated Specific Plan
Printer-friendly version
The Brisbane Baylands Specific Plan prepared by Universal Paragon Corporation (UPC) is available for public review, see below. Paper copies of the document are available for review at City Hall and the library. CDs of the document can also be obtained at the Community Development Department. Note that the applicant’s proposal is one of several alternatives for development of the site that will be evaluated in an environmental impact report (EIR) now under preparation. Once the EIR is published (anticipated in late 2012) there will be public hearings scheduled to discuss the EIR, the applicant’s Specific Plan proposal and other project alternatives.
Brisbane Baylands Specific Plan (February 2011):
Cover and Table of Contents
Executive Summary
1. Introduction
2. The Planning Area
3. Sustainability Framework
4. Land Use and Community Design
5. Conservation and Open Space
6. Circulation
7. Utilities and Services
8. Implementation
9. Public Facilities Financing
Appendix A: Brisbane Baylands Specific Plan/General Plan Consistency Analysis
Appendix B: Involvement of Other Agencies in the Baylands
Appendix C: Use Classifications - Brisbane Baylands Specific Plan
Appendix D: Glossary
Infrastructure Plan (February 2011)
- Appendix A: Evaluation of Soil and Groundwater (Part 2 / Part 3)
- Appendix B: Groundwater Monitoring Report OU-1 (Part 2)
- Appendix C: Goundwater Monitoring Report OU-2
- Appendix D: Water Quality Technical Report
- Appendix E: Aerial Topographic Surveys
- Appendix F: Landfill Geotechnical Investigations (Part 2)
- Appendix G: Railyard Preliminary Geotechnical Investigation
- Appendix H: Summer-Fall Semiannual Discharge Monitoring Report
- Appendix I: Earth Calc Baylands Revisions
- Appendix J: Landfill Closures & Construction Quality Assurance Plan
- Appendix K: Collection and Control System Design Plan
- Appendix L: Draft Leachate Management Plan
- Appendix M: (Note: Not Used)
- Appendix N: Water Use Projections and Water Balance
- Appendix O: Preliminary Storm Drain Calculations
- Appendix P: Central Drainage Channel Mitigation Design Storm Water Report
- Appendix Q: Proposed Caltrain Culvert Preliminary Evaluation
- Appendix R: Wetland Mitigation Plan
- Appendix S: Habitat Assessment